Maintenance planning scheduling and work control for the Sewage Treatment Plant

 

Ø INTRODUCTION


This  IACT Maintenance planning scheduling and work control for the  Sewage Treatment Plant course is the basic reference for the operation and maintenance of the equipment and processes in Sewage Treatment Plant and Knowing the capabilities and limitations of the complete wastewater treatment system and how to with best operate the system with changing loading and climate conditions

 Notifying managers of potential problems of a serious nature

 

 

Ø Objectives

 

At this program's conclusion, participants should be able to:

 

l  Conduct  performance evaluations for all parameters accredited Maintenance planning scheduling

l  Knowing all audits and inspections requested by Department of Ecology

Perform maintenance, calibration and operation of equipment.

l  Performs ground maintenance Sewage Treatment Plant

l  Use suitable performance indicators and management reports to perform regular analysis of maintenance performance, control maintenance resources and costs, and drive continuous improvement.

 

 

Ø TRAINING METHODOLOGY


This training course will combine presentations with instructor-guided interactive discussions between participants relating to their individual workplace. Practical exercises, video material and case studies aiming at stimulating these discussions and providing maximum benefit to the participants will support the training.

This interactive training course includes the following training methodologies as a percentage of the total tuition hours:

l  30% Lectures, Concepts, Role Play

l  30% Workshops & Work Presentations, Techniques

l  20% Based on Case Studies & Practical Exercises

l  20% Videos, Software & General Discussions

l  Pre and Post Test

 

 

Ø WHO SHOULD ATTEND?

 

Delegates should represent a wide range of personnel in the organization who are involved in, or dependent on, effective maintenance planning, scheduling and work control. These should include:

l  Maintenance and Operations professionals

l  Maintenance Engineers and Supervisors

l  Maintenance Planners, Schedulers and Work Preparers

l  Key Operations Supervisors

l  CMMS Administrator or key users

 

                                                                               Outline

Day 1

 

l  Evolution in Maintenance Management

l  The Maintenance Objective

l  Maintenance Planning and Scheduling, for World Class Reliability and Maintenance Performance

l  Purpose and Role of Maintenance Planning and Scheduling

l  ROLE of MAINTENANCE SCHEDULING

l  What Planned Maintenance Looks Like

l  Maintenance Planning Brings Benefits

l  WASTEWATER REUSE PERMIT AND STANDARDS

Ø        Municipal Wastewater Reuse Permit.

Ø        Permit Compliance Activities and Status

Ø        Permit Limits and Conditions

Ø       Monitoring Requirements

Day  2

 

 

l  Maintenance Management Policies

l  GENERAL PLANT DESCRIPTION.

l  Document Identification and Classification Facility Description

l  Equipment Classification and Identification Wastewater Characteristics .

l  Maintenance Work Prioritization

l  Maintenance Logistics Planning

l  The Strategy Behind Maintenance Planning

Day 3

 

 

l  Operation and Control of Unit Operations

Ø  Collection System

Ø        Valves .

Ø        Piping and Fittings .

Ø       Wastewater Flow Meters .

Ø       Pressure

Ø        Lagoon System

Ø        Normal Operation .

Ø       Aeration System

Ø      Process Controls

Ø       Pivot Pump Maintenance Operations

l  Standardize Your Maintenance Planning Process from the Start

l  A Maintenance Job Plan Lists Every Job Task along with Every Milestone Activity

 

Day 4

 

l  Work Planning, Scheduling and Control for Pivot Irrigation System

l  Work Notification Process and  Application Rate

l  Development of Weekly Master Schedule for Operational Parameters

l  Determine Resource Availability

l  Determine Equipment Outage Requirement

l  Management of the Forward Workload (Backlog)

l  Weekly Master Schedule Implementation for General Monitoring Requirements for Lagoon

l  You Do Need Detailed Job Procedures

Ø        Compliance Monitoring.

Ø        Analytical Methods

Ø        Loading Rate Calculations

Ø        Monitoring Quality Assurance

Day 5

 

l  Performance Measurement, Management Reporting and Creating Procedures and Check Sheets with Quality to Improve Reliability to Equipment Maintenance and Scheduling.

l  Performance Indicators for Supplies and Spare

l  Workload Performance Indicators

l  Effectiveness Performance Indicators in  Operation, Sampling, and Testing Log

l  Cost Performance Indicators in Maintenance Records

l  EMERGENCY PLAN

l  Emergency Operation

l  job Plan of the Process for Installing storm water and sub-soil drainage systems to an approved point of discharge

 

Schedule

 

  • 08:30 – 10:15 First Session
  • 10:15 – 10:30 Coffee Break
  • 10:30 – 12:15 Second Session
  • 12:15 – 12:30 Coffee Break
  • 12:30 – 14:00 Third Session
  • 14:00 – 15:00 Lunch

 

Fees

 The Fee for the seminar, including instruction materials, documentation, lunch, coffee/tea breaks & snack :