Quality Control for Drainage Construction Projects

     

Place: Istanbul 

May 23 - May27\ 2022

September 26 - September 30 \ 2022

October 03—October 07\2022

Introduction

     The drainage construction team is responsible for the proper setting out, excavation, pipe laying and back filling of drainage trenches. Suitable compaction techniques are important if rework associated with settlement is to be avoided.

The team members should have a good knowledge of various types of pipes, jointing systems and a good knowledge of materials suitable for both bedding and backfilling.

The course attempts to highlight the aspects of construction that will have a significant effect on the quality of the finished product.

The quality control and quality assurance system are the organizational structure, responsibilities, procedures, processes and resources for implementing quality management. The quality system has to control what is produced to make sure it meets the requirements of the client and, secondly, it has to provide confidence or assurance is needed by both the contractor and the client in this course Quality Control and Quality Assurance system for drainage project is developed.

On completion of this course participants will

Ü Describe factors in road drainage system design

Ü Identify safety requirements of trench shoring

Ü Describe the construction of road stormwater systems

Ü Describe the construction of subsoil drainage systems

Ü Describe the drainage system structures and their connections

Ü Describe road drainage system maintenance and repair

Ü Demonstrate knowledge of subsoil drainage systems

Ü Describe piped culvert drainage systems

 

Objectives 

At this program's conclusion, participants should be able to:

Ü Total quality management system

Ü Provides an overall background on current and historical practices for inspection and Quality Assurance and Quality Control  of trenchless rehabilitation projects including definitions of key terminology.

Ü Quality Control  for Drainage Construction

Ü Describe factors in road drainage system design 

Ü Summarizes Quality Assurance and Quality Control  practices from a vendor‟s perspective.

Ü Summarizes Quality Assurance and Quality Control  practices from a utility owner‟s

perspective.

Ü Auditing the construction site quality

Ü Reviews the types of as-built data collected by utilities and how the information is used within their asset management programs.

Ü Provides an overview of best Quality Assurance and Quality Control  practices identified from this review for key trenchless technologies and also discusses overall recommendations for improving and facilitating the use of Quality Control  programs by utilities.

Who should attend ? 

Ü Suitable to those who are interesting in understanding the aspect of QA\QC IN THE CONSTRUCTION INDUSTRY 

Ü Engineers who need to design sewage pumping stations, whether as part of their daily work or only occasionally.

Ü Engineers and others who are called upon to assess designs submitted for approval.

Ü Project Managers & Procurement Professionals who need to be aware of the issues.

Ü Operation Professionals in drainage networks

Ü Maintenance Professionals in drainage network

Course Methodology

The course uses self-assessments and a wide mix of business cases that promote healthy discussions around the importance of managing multiple tasks, deadlines and priorities. Participants will benefit from role plays covering workplace challenges related to handling tasks, deadlines and priorities. They will learn how to deal with conflicts that may arise as a result. Interactive team exercises are also used with each team presenting their findings and comments.  

 

This interactive training course includes the following training methodologies as a percentage of the total tuition hours:

  • 30% Lectures, Concepts, Role Play
  • 30% Workshops & Work Presentations, Techniques
  • 20% Based on Case Studies & Practical Exercises
  • 20% Videos, Software & General Discussions

Pre and Post Test

 

Outline 

DAY 1:

Total Quality Management System

Ü Quality Assurance & Quality Control

Ü Who will perform the quality control?

Ü Quality Management  in Drainage construction Projects

Ü Pareto Chart

Ü Auditing the Construction Site Quality

Introduction to The drainage construction

Ü  The Decision making process

Ü    Introduction to reliability and Weibull analysis

Ü      Infrastructure performance

Ü   Performance modeling

Ü   Management alternatives & scenarios generation

 

DAY 2: 

Inspection and  Quality Assurance and Quality Control  for Trenchless Rehabilitation Projects

Ü  Qualification Testing for Trenchless Rehabilitation Projects

Ü  Quality Assurance and Quality Control  Procedures for Trenchless Rehabilitation Projects

Ü Qualification Testing for Trenchless Rehabilitation construction drainage

Ü Projects  Procedures for  construction drainage Projects

Ü Historical Perspective on Inspection and QA/QC for construction drainage Projects

DAY 3: 

Quality Assurance and Quality Control  Practices and Field Inspection Advocated by Vendors

Ü Quality Assurance and Quality Control   Practices

Ü  Close-Fit Liner Quality Assurance and Quality Control   Practices

Ü Sprayed-On Coating Quality Assurance and Quality Control 

Ü GIPL Quality Assurance and Quality Control   Practices

Ü  Pipe Bursting Quality Assurance and Quality Control   Practices

Ü The design , structural characteristics and technical requirements of the design

Ü  Increase the smoothness and slope of HDPE drains

Ü Construction process should be in accordance with the technological process to ensure the quality

DAY 4 :

Current  Quality Assurance and Quality Control  Practices by Utilities for Trenchless Projects

Ü Future Trends in  Quality Assurance and Quality Control  Practices by Utilities for Trenchless Rehabilitation Projects...

Ü The quality awareness and technical

Ü Construction standardization

Ü Effect check

Ü Sampling inspection of 250 completed planting roof’s waterproof and drainage construction points

Ü Rate of self-inspection , which shows that the plan goal is achieved

Ü QC control

Ü the project master to promote standardization of the construction process

DAY 5  

RECOMMENDATIONS FOR IMPROVING Quality Assurance and Quality Control PRACTICES in

The drainage construction Process

Ü The quality Procedure drainage construction

Ü Quality Assurance and Quality Control DATA COLLECTION AND ASSET MANAGEMENT

Ü Quantity and Quality of As-Built Data Collected

Ü Use of As-Built Information in Utility Asset Management Programs

Ü Desired Use of As-Built Information and Potential Benefits from Its Collection ..

Ü Study Case ( Canada , CALLON project )

Ü Study Case (Denmark . KENON project )

Ü Study Case ( Muscat Dera project)

Ü Conclusion 

Fees:

The Fee for the seminar, including instruction materials, documentation, lunch, coffee/tea breaks & snack is:

 5,250 USD$

 

Schedule:

08:30 – 10:15 First Session

10:15 – 10:30 Coffee Break

10:30 – 12:15 Second Session

12:15 – 12:30 Coffee Break

12:30 – 14:00 Third Session