Electrical Safety and Lockout/Tagout (LOTO) in Construction
Electrical Safety and Lockout/Tagout (LOTO) in Construction
π
Duration: 5 Days
π· Target Audience: Expert Safety Engineers, Electrical Engineers, Site Supervisors, Maintenance Managers
π― Skill Level: Advanced
π Course Objectives:
By the end of this course, participants will be able to:
β Identify electrical hazards on construction sites and develop mitigation strategies.
β Implement Lockout/Tagout (LOTO) procedures to prevent accidental energization of equipment.
β Understand OSHA 1910.147, NFPA 70E, IEC 60204-1, and ISO 45001 standards for electrical safety.
β Conduct risk assessments and electrical hazard analysis using specialized tools.
β Apply arc flash protection strategies to prevent electrocution and burns.
β Utilize IoT-enabled safety devices and AI-driven monitoring for electrical risk prevention.
β Develop emergency response plans for electrical incidents.
π Course Outline:
π’ Day 1: Fundamentals of Electrical Safety in Construction
πΉ Common electrical hazards on construction sites (shock, arc flash, electrocution, fire).
πΉ Electrical safety regulations and standards (OSHA, NFPA 70E, NEC, ISO 45001).
πΉ Understanding electrical shock and arc flash incidents: Causes, risks, and statistics.
πΉ Grounding and bonding principles for electrical installations.
πΉ Case Study: Analyzing a real-world electrical accident on a construction site.
π’ Day 2: Lockout/Tagout (LOTO) Procedures and Best Practices
πΉ Introduction to Lockout/Tagout (LOTO) systems: Purpose and importance.
πΉ Key components of an effective LOTO program: Locks, tags, verification, and procedures.
πΉ Step-by-step implementation of LOTO in construction.
πΉ LOTO program auditing and compliance verification.
πΉ Hands-on Exercise: Conducting a LOTO procedure on construction equipment.
π’ Day 3: Arc Flash Risk Assessment and Protection Strategies
πΉ Understanding arc flash incidents: Causes, hazards, and severity.
πΉ Arc flash boundaries and PPE selection (NFPA 70E guidelines).
πΉ Use of infrared thermography and electrical testing equipment for risk assessment.
πΉ Arc-rated clothing, gloves, and face shields: Selection and usage.
πΉ Case Study: Investigating an arc flash incident and implementing corrective actions.
π’ Day 4: Smart Technologies and Emergency Response for Electrical Safety
πΉ AI-powered monitoring systems for real-time electrical hazard detection.
πΉ IoT-enabled sensors and wearable devices for voltage and current monitoring.
πΉ Developing an emergency response plan for electrical accidents.
πΉ First aid for electrical shock victims: CPR, burn treatment, and rapid response.
πΉ Case Study: Using IoT in preventing electrical hazards in a public infrastructure project.
π’ Day 5: Case Study & Real-World Application
πΉ Hands-on case study: Developing an electrical safety and LOTO implementation plan.
πΉ Conducting a risk assessment on a construction siteβs electrical system.
πΉ Live demonstration of proper LOTO procedures and safety verification.
πΉ Final assessment and emergency response drill.
πΉ Certificate of Completion & Closing Remarks.
π Tools & Software Used:
β
LOTO Management Software (eLOTO, Brady LINK360, Master Lock) β For LOTO program tracking.
β
Electrical Safety Tools (Fluke Thermal Imagers, Voltage Testers, Megohmmeters) β For risk assessment.
β
Arc Flash Analysis Software (ETAP, SKM PowerTools, EasyPower) β For hazard simulation.
β
IoT-Enabled Safety Monitoring (Smart Sensors, AI-Based Electrical Risk Analytics) β For real-time tracking.
β
Power BI / Tableau β For data visualization and compliance reporting.
Β